Permit Fees
Connection Fees (GFCs)
Per District Resolution 299-04, approved by the Board of Commissioners
on October 27, 2004, the revised connection fees are as follows:
| a. Residential (including modular homes) |
$3,600 each |
| b. Multiple family (apartments, condominiums,
duplexes, hotels and motels) |
$2,880 per unit |
| c. Commercial/Business/Industrial* |
$3,600 for the first 1,000 sq ft
$3.60 per each add'l sq ft |
| *At the property owner’s option
the fee will be a rate of $18.95 per gallon per day. A fee based
upon flow will initially be determined based on a certified flow
calculation prepared by a registered Engineer or Architect in the
State of Washington and the judgment of District staff. The connection
fee will then be adjusted after six months or full occupancy whichever
comes first based upon actual water usage at the facility. If not
fully occupied in six months the average daily water usage for the
six-month period will be applied to the entire project, as if fully
occupied. |
| |
Inspection Fees are charged for final
inspection of connections and reconnections to the sewer system. The
current inspection fee is $125.00 per stub.
Area Charges, based on the size of the
property, are assessed to all properties within the District’s
boundaries, generally at the time of annexation into the District. Most
properties within the District have paid the appropriate area charges.
However, there are still a few properties that have not. You will need
to contact the District office to verify payment of area charges associated
with your property.
Assessments are charged at the time sewer
utility improvements are made to the property, generally through a ULID
(utility local improvement district). All ULID assessments are collected
by the Snohomish County Treasurer. Questions regarding assessments should
be directed to the Treasurer’s office at 425-388-3750.
Plan Review Fees are charged and collected
prior to approval of submitted plans. The current plan review fee is
$125.00 per stub or building, whichever is greater. If the plans require
the installation of a main line, a main line inspection fee of $125.00
is also charged.
Please contact the District office if you have any questions.
©2005-2007
Olympus Terrace Sewer District
K.P.
Design